I'm including a couple shots I took last weekend of my work in the last two rooms on the first floor (the dining room and the "pink" room). Mainly what you see is a trench I created in both ceilings to all

The pink room got two new cans (*snicker*) and that was that. The picture on the right shows the pink room and the top of what I've created as a door to the kitchen. There's a larger picture of that creation to the left. In all of the months of renovation the house, there is one place that dirt and construction debris is not acceptable. *drum roll*...

I've also added a little picture of what my left arm looked like after just that little demo in the dining room ceiling. Please keep in mind that it was only a small trench where I broke the plaster with a wallbaord saw

At this point we feel confident enough about where we're at that we have our dude Jose the drywaller on call to start in the next week or so. He estimated that it'll take about 90 sheets of sheetrock, so this isn't some small job. But at the same time he thinks it'll take two days to hang it all and three more to tape and mud. Man, we hope so! Given the fact that Christina is something like 31 weeks pregnant at this point, we have to get the sheetrock up, all of it primed (two coats), the ceilings painted, and at least the kid's room painted with the trim in place. We also need to get the floors refinished on the first floor, but honestly, I'm not sure there's time. We'd like to get all of this done by March 1st to allow a max of one month before the kid arrives to get her room ready and some feeling of being situated.
But to this point what is being "situated" in this house?
If anyone in the Philly area wants to help out with the painting, I have all the pizza and beer you might require. For real. Just let me know when you all want to stop by!
No comments: