Progress while in Indy:
- Supply lines were run for the bathroom
- The tub was hauled from the first to the third floor
- The electrical was wrapped up and passed inspection (who would have guessed!)
We've also ordered our hardwood floors for the bedroom. I'm hoping it gets here on Thursday, and is just 15 crates of flooring weighing a combined 600 lbs. GREAT. I"m looking forward to that workout.
Our windows were brought over today which we've been waiting on for over a month. ----------------->
The insulation in the ceiling was put up today, which had to be fun for the guys. Everyone has been just asking over and over to show some terribly exciting pictures of the insulation...so here you go!!!
The next item on the agenda is the drywall which is to start tomorrow. If all goes well the dry walling should be done by Friday, which the leads to the windows being installed (as well as the new one being created) early next week. I think at this point I need to see some drywall, tape and mud up there. It'll be like some religious experience or something. Or at least I'm hoping so...I'm bored with Christina being gone.
Besides that I wanted to post a picture of the new shutters that were loving passed to us from my parents. They are from my grandparents house in Indianapolis, and we think they'll make a cool element to cover the block walls in the back yard. But I'll let the boss handle that when she gets back.
1 comment:
Looks like it will start coming together quickly now! Can't wait to see the construction. I know you will put those shutters to good use!
Bruce/Dad
Post a Comment